11. Small Sewer Channels

The construction of the sewer CHANGES
here, the main channel dividing into 3
smaller tunnels. The walls are still made ov
brick and the ceilings of stone, but there are
no longer any dry ledges to walk upon. The
floor is solid, but is covered by about 2 feet
of sewage flowing towards the main channel.  <Rate of Flow = x (DSG)>
Wading through this is difficult and tiring. <Fighting in Water, WSG> <Fatigue, WSG>
All movement is reduced by one 1/4th
&& all “to hit” rolls must be made at -1.
 

>>12.